Storage
ID | Interface | Name | CAPEX (INR/HH) | OPEX (INR/HH/Year) | Land Req.(m2/HH) | Ground water level constraint | Soil Type available | |||
---|---|---|---|---|---|---|---|---|---|---|
1 | Twin pit | 4500.0 | 400.0 | 2.5 | Deep | silty | ||||
2 | Septic Tank with contained outlet | 50000.0 | 1200.0 | 3.5 | Shallow | clayey | ||||
3 | Septic Tank with uncontained outlet | 75000.0 | 1500.0 | 3.75 | Deep | silty | ||||
4 | Biogas digester | 60000.0 | 1400.0 | 3.39 | Shallow | clayey | ||||
5 | Septic Tank with uncontained outlet - (C&P) | 250000.0 | 5000.0 | 12.5 | Deep | clayey | ||||
6 | Biogas digester - (C&P) | 176991.2 | 4666.66 | 11.3 | Shallow | clayey | ||||
8 | Composting chamber +Urine Tank | 15000.0 | 1000.0 | 3.0 | Shallow | clayey | ||||
9 | Composting chamber | 10000.0 | 800.0 | 2.5 | Shallow | clayey |